← current checkpoint

Archived snapshots

Earlier published versions of the mining-boost optimizer, preserved verbatim.

2026-05-31 — two-lever, per-leg method

The original checkpoint: two boosts (return-cargo + long-mine), per-trip perturbation characterization, the 4→9-worker prediction test (26–85% transfer), and full-boost capstone replays across seven maps. Superseded by the three-boost / round-trip-frames method on the current checkpoint, which reaches 100% correspondence on Match Point 1.4. Replays and per-map summaries from this run are bundled in the snapshot.

OpenBW (frame-exact BW 1.16.1) on Jetson aarch64